BMP Installation in New Mexico — Supply, Install, and Inspect Under One Roof

Best Management Practices (BMPs) must be installed and functional before any ground disturbance begins under NMR100000. Inspections Plus is a licensed New Mexico Erosion Control Product Supplier — we supply the BMPs we design, eliminating the coordination gap between your SWPPP plan and what goes in the ground.

Licensed NM Product SupplierNMR100000AZPDESTrackout Mat Sales · Rental · InstallPre-Construction BMP

The One-Roof Advantage

The most common SWPPP failure pattern: the SWPPP specifies a BMP, the contractor purchases a different product, the inspector notes a discrepancy at the first 14-day inspection, and corrective action is required within 7 days. This cycle delays projects and creates enforcement risk.

📋
Plan
SWPPP specifies exact BMP products by manufacturer and model
📦
Supply
We source the exact products specified — no substitutions without SWPPP amendment
🔧
Install
We install per manufacturer specs and NMR100000 Part III BMP design criteria

Full BMP Catalog — NM/AZ Specifications

Silt Fence + Stakes

Caliche-rated anchoring specs for hardpan soils
  • Woven and nonwoven geotextile silt fence
  • Steel T-post or wood stake options
  • Amended anchor specs for caliche zones
  • Sediment removal and disposal included

Fiber Wattles (Straw / Compost)

Caliche staking guide — 18" minimum penetration
  • Straw wattle and compost wattle options
  • 10-inch and 12-inch diameter available
  • Caliche-specific staking protocol
  • Slope check, channel liner, and inlet protection configurations

Rock Check Dams

Arroyo setback requirements, ephemeral flow coordination
  • Rip-rap and angular stone gradations
  • Site-specific sizing for flow velocity
  • USACE 404 jurisdictional evaluation
  • Ephemeral channel setback compliance

Inlet Protection Devices

Curb inlet and grated drain configurations
  • Curb inlet sediment filters
  • Filter fabric sock inserts for grated inlets
  • Wattle ring inlet protection
  • Sediment removal and restoration after storm events

Sediment Basins

Infiltration assumptions adjusted for NM clay/caliche soils
  • Basin sizing per NMR100000 67 cubic yards/acre requirement
  • Adjusted infiltration assumptions for caliche soils
  • Outlet protection and skimmer installation
  • Inspection and sediment removal protocol

Trackout Control Mats

Details →
Sales, rental, and installation
  • HDPE pyramid mat construction — 420 lb, 12'×7'×3¾"
  • Eliminates trackout to paved surfaces
  • NMR100000 + CABQ fugitive dust compliant
  • 30-min installation, no equipment required

Diversion Berms

Used for flow redirection around disturbed slopes
  • Earthen diversion berm construction
  • Compacted soil or rock berm options
  • Upslope diversion away from drainage areas
  • Integration with sediment basin inlet design

Concrete Washout Systems

Required at all sites with concrete delivery
  • Prefabricated contained washout bins
  • Site-built earthen containment with liner
  • Signage and access route marking
  • Removal and disposal coordination

Hydroseeding

Details →
NM native species — monsoon timing for best establishment
  • Native seed mix per NM elevation zone
  • Tackifier and mulch application
  • Monsoon-season timing for optimal germination
  • 70% cover verification for NOT eligibility

Erosion Control Blankets

Details →
Desert-rated — UV-stabilized, open-weave for arid soils
  • Curlex and jute erosion control blankets
  • Desert-rated open-weave specifications
  • UV-stabilized for extended NM sun exposure
  • Slope and channel liner configurations

Installation Standards

All BMP installations are documented with pre-installation and post-installation photography, GPS coordinates, and inspector certification. This documentation is incorporated into the SWPPP as the pre-construction BMP installation record.

Before Installation

  • Site walk with SWPPP BMP map in hand
  • Soil and drainage confirmation at each BMP location
  • Caliche depth assessment at silt fence locations
  • Arroyo jurisdiction determination at check dam sites

After Installation

  • GPS-tagged photographs of all installed BMPs
  • Installation record incorporated into SWPPP
  • Pre-construction inspection report generated
  • Construction crew briefing on BMP maintenance

Ready to get started?

Inspections Plus provides transparent, itemized estimates — not fixed-price contracts. Call or submit a request and we'll follow up within 1 business day.